Timetable: Paynes Subdivision - St. Thomas to Glencoe

As of 1990

Station MP from St. Thomas Notes
St. Thomas 0 J=CASO
Southwold 2.0 J=spur
Paynes 4.5  
Thames Rver 14.5
Glencoe 27.7  
     

Notes:

Note Key:  A=Autmatic Intrrlocking | C=Coal | D=Open during the day | DN=Day and night | HI=Half Interlocker | I=Interlocker | N=Open at night | P=Passing Track w/40' car capacity | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard

[REF]=CN Employee Time Table 43, May 27, 1990


In 1990 - Manual Block System Speed: 50 MPH. No passenger trains.

At St. Thomas, connection between the Talbot and Chatham subs is via yard track.

At Glencoe - Connection between Paynes and Chatham subs is via track 4.

Spur at Southwold extends 4.2 mils northward, switch points facing west.

Controlled by CSX Dispatcher.

 

Bibliography

The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:

  • [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
  • [AAN] = Alpena Argus newspaper.
  • [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
  • [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
  • [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI

Contact Us

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

 
Email: webmaster@michiganrailroads.com

Social