- Details
- Hits: 814
Timetable: MC Camp 14 Branch
Time Line
1917. The Michigan Railroad Commission approves the removal of the back end of the Camp 14 Branch, beginning at a point near the center of SW 1/4 of NE 1/4 of Section 19, T29N - R5W, runnning northwesterly 2,805.6 feet. [MCR-1917]
1917. They were also granted permission to remove a section beginning at a point on N & S 1/4 line of Section 20, T29N-R5W, and running west and northwest 5,991.1 feet. [MCR-1917]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI