- Details
- Hits: 857
Timetable: MC Black River Branch
Time Line
1917. The MCRR receives permission to remove their Black River Branch extending 13,996.5 feet south from a point 1,312.7 feet south of the north switch of Keough siding. [MCR-1917]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI