- Details
- Hits: 572
Timetable: Copper Range Railroad - Baltic Mine Branch
The Baltic Mine branch connected the Copper Range main line with the Baltic Mine.
Station | MP from Baltic Junction | Notes |
Baltic Junction | 0.0 | |
Baltic Mine | 1.16 | |
Key: BB=Bascule Bridge | C=Coal | CS=Car Shop | D=Open > Day | DN=Open Day and night | DS=Dispatcher | DT=Double Main Track | EH=Enginehouse | HI=Half Interlocker | I=Interlocker | J=Junction | LB=Liftbridge | N=Open at night | P=Passing Track w/40' car capacity | RH=Roundhouse # stalls | S=Scales | SB=Swingbridge | T=Turntable | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard
[REF] = COPR timetable + [MRL] + additions.
Time Line
1902. This branch line is built to serve the Baltic Mine. [MRL]
1973. The branch is removed after the Copper Range company ceased operations. [MRL]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI