Railroad: Quincy and Torch Lake Railroad Company

The Quincy and Torch Lake railroad connected the Quincy (and other nearby) mines north of Hancock, with the copper stamp mills near Dollar Bay on Torch Lake. Track gauge was 3' 0".

The road crossed over the DSS&A at Masonville, and the COPR at Torch Lake. It also crossed under the COPR at Torch Lake.


Built → Quincy & Torch Lake Railroad → Abandoned


Chartered: June, 1888. Owned by Quincy Mining Company.

Built: 1888 - Quincy Mine to short of Torch Lake in Section 23 T55N-R33W

Operated: 39 Years - then 40 more years as a private industrial railroad.

Dissolved: 1927 - converted to a private ore road, abandoned in 1967.

Reference: [MRRC]


Notes

Starting downhill at the Quincy Mine (milepost 0.0), the line crossed the Mineral Range Quincy Mine branch at milepost 0.3, then crossed the Mineral Range Arcadian Mine branch at milepost 5.2, then crossed the Copper Range railroad at milepost 5.7, and finally crossed the MR's Hancock & Calumet line at milepost 5.9 - before reaching the mills at Torch Lake at milepost 6.0.


Time Line

Late 1880's. The Quincy Mine is under pressure to limit stamp sand discharge into Portage Lake. Plans were created to build a new mill on Torch Lake in Section 23, T55N, R33W about six miles from the mine as well as a three foot narrow gauge railroad to transport rock to the new mill. [CRR]

1889. Summer. The new line is opened from Quincy Mile to the new mill site, except for crossing of the Franklin and Pewabic mine property. These mines ultimately negotiated rights across these properties. [CRR]

1889. An elevated tramway was built to carry coal to the new mill powerhouse. Two 50 foot turntables were also installed. Four hundred feet of elevated tramway was built from the railroad to the mill. [CRR]

1890. Line opened from Quincy Mine to the new Quincy Stamp Mill near Dollar Bay, a distance of 6 miles. [MCR-1904] The maximum grade on the line is 2.4% from mill to the mine.

1891. One mile of new line and sidings were built between the Q&TL terminal and new works at North Quincy. An incline track was built from the railroad down to the mill. [CRR] 

1893. The old stamp mill (on Portage Lake) was dismantled. A new pumping station is erected there to bring water up to the mine and new railroad. [CRR]

1898. The Quincy Mining Company plans for a new mill, smelter and other improvements. Construction begins in May.  Three furnaces were in operation by the end of the year. The smelter was served by the Hancock & Calumet railroad (MR). It was in Ripley and not served by the Q&TL. [CRR]

1902. The Q&TL has 6 miles of track, three foot narrow gauge. [MCR-1902]

1903. SNAPSHOT: The Q&TL operates five locomotives, 12 platform cars, 113 ore cars and 3 conductor way cars. 29 of these cars had air brakes, the remainder did not. The railroad used both link-and-pin couplers as well as automatic couplers. The railroad carried 958,034 tons in 1903. [MCR-1904]

1906. A new 1,400 foot passing siding is built halfway between the mine and the mill. A dedicated telephone system is installed for railroad use. [CRR]

1907. A new water tower encased in a wooden building was erected at the mine terminal along with a new coaling station. Ore cars were given air brakes. [CRR]

1912. Turntables at each end of the line were removed and replaced with wye tracks for turning locomotives. [CRR]

1917. A connection is built so that the DSS&A can reach the coal dock in Mason. [CRR]

1921. Railroad operations were dramatically curtailed due to a depression in the mining industry. Mill #2 was closed and railroad operations were reduced.

1929. The stock market crash deals a final blow to many Copper Country mines. The Quincy Company mines shut down in 1931.

1934. 33% of families in Houghton County were on relief. [CRR]

1936. The Q&TL resumes hauling coal. By 1937, some of the stamps in #1 mill were reactivated. [CRR]

1937. November 15. Train Plunges into a Washout, Engineer Is Buried Under Rock Slide. Searchers Monday night sought Walter Lauren, fireman of a mine train, beneath a pile of train wreckage and mine rock. Earlier in the day the body of Engineer Joseph Schneiderhan was found at the throttle of his engine, buried under rock that piled on the locomotive when three freight cars followed it in its plunge through a washed-out culvert. Recent heavy rains were believed to have weakened the culvert so that it would not bear the weight of the engine.

Schneiderhan's body was found by Conductor Ernest Spear and Brakeman Einar Atatala a few minutes after the wreck. The hunt for Lauren was made difficult because of the huge amount of rock covering the wreckage. The train, consisting of 13 cars, was carrying rock from the Quincy mine to the Quincy mill. The railroad, the Quincy and Torch Lake, is owned by the Quincy company. [DFP-1937-1116]

1938. The fill just north of the mine yard was completed and 1,600 feet of track laid over it. The fill was 90 feet deep. [CRR]

1945-1947. The Q&TL railroad is shut down when the mine closed. It remained in a "state of suspended animation" and many locomotives, the rolling stock and track remained in place. [CRR]

1967. The line is abandoned. [MRL]

1974. October 1. The rails and bridges of the Q&TL are removed. [CRR]

Bibliography

The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:

  • [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
  • [AAN] = Alpena Argus newspaper.
  • [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
  • [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
  • [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI

Contact Us

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

 
Email: webmaster@michiganrailroads.com

Social