Mine: Pontiac Mine, Negaunee, MI
Began → Pontiac Mine → Became
Operated for:
From:
Location: NW-NE Sec. 12 of T47N-R27W
Owned by:
Produced: Iron Ore
Method:
Railroad connection:
Until:
Lifetime Production: 1,500 tons, dates unknown
Source: [LSIO-1950]
Notes
Time Line