Mine: Smith Mine, Palmer, MI


Began → Smith Mine → Cheshire Mine


Operated for 4 years.

From: 1872

Location: SE 1/4 of the SE 1/4 of Section 18, and NW 1/4 of Section 20, T45-R25. 

Owned by: Clevland Cliffs Mining Company

Produced: Iron Ore

Method: 

Railroad connection: On C&NW Smith Mine branch.

Stamp Mill/Pellet Plant:

Until: 1876

Lifetime Production: 48,544 tons shipped between 1872 and 1878


Notes

This mine was closed in the winter of 1873 and reopened in 1877 when the mine was changed to the Cheshire Mine. [LSMI-1909]

Nonproducing in 1908.


Time Line

 

Contact Us

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

 
Email: webmaster@michiganrailroads.com

Social