- Details
- Hits: 2871
Mine: Genesee Mine, Crystal Falls, MI
Ethel Mine → Genesee Mine → Became
Operated for 33 years.
From: 1902
Location: SE Sec. 30, W 1/2-SW and NE-SW Sec. 29 of T43N-R32W
Owned by: Corrigan McKinney Steel Co. Acquired by Republic Steel Corp. in 1935. Lease surrendered in 1936.
Produced: Iron Ore, soft reddish-brown, high phosphorus. Crushed.
Method: Underground. Depth: 860 feet.
Railroad connection: C&NW and MILW to their Escanaba ore docks.
Until: 1935
Lifetime Production: 1,198,383 tons between 1902 and 1935.
Source: [LSIO-1950]
Notes
Time Line